Commercial Construction & Renovation

MAR-APR 2016

Commercial Construction & Renovation helps our subscribers design, build and maintain better commercial facilities by delivering content to meet the information needs of today's high-level executives.

Issue link: https://ccr-mag.epubxp.com/i/666154

Contents of this Issue

Navigation

Page 116 of 126

PERSPECTIVE PERSPECTIVE Finding your priority Why commissioning is more important than signing the contract By Scott Offermann I n today's world we believe in instant gratifcation. We want what we want and we want it now. This attitude is everywhere, and in every business. In many cases, instant delivery is achievable and businesses are built around this expectation. Fast food. Same-day delivery. In by 10, and out by 5. But construction should never be in this category. Unfortunately, many of our customers do not share this view. Oftentimes, the cus- tomers will demand accelerated scheduled to meet their deadlines, and objectives with no regard for the issues and problems created. They repeatedly ask for compressed work schedules, shortcuts to re- duce construction time, occupation before construction is completed and the elimination of commissioning. Unfortunately, in almost all of these situations, the fnal product is defcient in some manner. In more and more instances, the def- ciencies are being addressed through litigation, costing contractors more than profts. Whether it's requested at the same cost or if the customer provides fnancial incentive, contractors should never sacrifce the fnal product in order to achieve unrealistic delivery timelines of the customers. When planning a project, identifying the tasks and the order for each project is the frst step. Identifying, defning and allowing the re- quired time and resource to complete each step also is part of the fundamental requirements. Soil compaction, the curing of concrete, necessary inspections, and the setting and drying of fnish- es require a specifc amount of time. Depending on the products and location, there also can be manpower constraints, weather impacts and the necessary commis- sion of equipment. Compressing time frame to a point work does not occur places the project in danger of having signifcant failure issues in the future, leading to occupant health and safety issues. Ultimately, these avoidable issues can cost contractors and sub-contractors signifcant time and money, as well as damaging reputations. Today, more and more of these issues end in litigation, with the bulk of the burden falling on the contractor. In most instances, the item that's the most critical to the continuing operation of any facility is deleted or at best abbreviated. This is the full commissioning the project. Whether constructing a complex mission critical space or a simple tenant improvement, the testing of the systems prior to required use is essential. During the commission process, items identifed typically are simple to repair and address. After the building is occupied, these same simple issues become a major task. The interruption of busi- ness operation because air conditioning systems must be turned off for several hours, power disruptions, breaker testing or something as simple as fushing the building with fresh air becomes a major crisis for the new occupants. It also places stress and inconveniences on the sub-contractors and contractors extended staff. It is during these times of high stress and occupant complaints that contractor are placed in a defensive position. Without the proper documentation and preparations, the customer takes little or no responsibility for the situation that they were pivotal in creating. The process of commissioning is something that must be a requirement rather than a suggestion. It is only with the complete commission that the contractor defnitively can state that the building is complete and operating as designed. It is during the commission- ing period design that equipment and operational issues are identifed. This allows the ability to address these issues in a proactive manner as opposed to reactive. Many times, building management systems have programming errors that create heating or cooling issues, and operational defciencies that are identifed and are not the result of construc- tion. After the building becomes occupied, all issues become contractor problems rather than the responsibility of the engineering and design team who created the defciencies to begin with. In many instances, these design teams divest themselves from the issue shifting the blame to the installation or operations team leaving the contractor left to take responsibility for addressing these issues. When customers request the acceleration and omission of specif- ic work, contractors must take a frm stand, and what can and cannot be accomplished. There is a point that, as professionals, delivery requests cannot be met. It is imperative that when customers attempt to force the acceleration of projects and the deletion of the commis- sioning process, contractor's document the risk associated with these decisions and have customers accept the liability of these actions. This is not simply a conversation during a meeting, but written communication with not only the customer, but also the design teams. This will assist in protecting the contractor and sub-contrac- tors from unreasonable expectations and shift the liability to either the customers or the design team. This can include the limitations of equipment warranties as well as the setting of support guidelines. Being prepared to take a frm stance on these necessary steps will protect contractors against damaged reputation and fnancial loss. CCR Scott Offermann is a manager director for Cushman & Wakefeld. You can reach him at Scott.Offermann@cushwake.com or on LinkedIn athttps://www.linkedin.com/in/soffermann. The process of commissioning is something that must be a requirement rather than a suggestion. 112 COMMERCIAL CONSTRUCTION & RENOVATION — MARCH : APRIL 2016

Articles in this issue

Links on this page

Archives of this issue

view archives of Commercial Construction & Renovation - MAR-APR 2016